This is bathroom debut week! I ripped out the old bathroom decor in March and finally the bathroom is complete. Each phase took a while so you will see it as it has evolved.
The most expensive part was refinishing the floor. Originally there was carpet (yes padded carpet!) on the floor. I had ripped that up a long time ago and then covered the padding with backer board. My theory was that if I covered it up then I could just pretend it wasn't there.
Well, the wonderful handyman that I hired to tile the floor told me that wasn't so! Thus, he had to tear out the floor all the way down to the studs and rebuild the subfloor before he could even begin to tile. Thank goodness this didn't add too much time to the ticking clock.
What did add a ton of time was laying the tile. It is so delicate and intricate. Centering the rows and columns. Making sure the edges are even and cutting each end piece individually. Watching how the pattern turns the corner and interacts with the toilet and door frame and bath tub. Thank goodness I did not decide to attempt this project on my own!
So here is the tiling stage of the bathroom redo!